![]() |
PANORAMIC Photo By backmans |
This THP is 9 miles SE of Coffee Creek, CA, and about 6 miles NE of Trinity Center on the eastern side of Trinity Lake at an elevation of 3,000 to 4,000 feet. Sierra Pacific Industries is planning a mostly clearcut tractor and cable logging in ponderosa pine, sugar pine, Douglas fir, white fir and incense cedar forests. There are 2 unstable areas in sections 30 and 31. Sierra Pacific Industries is planning to use ground based equipment in areas designated for cable logging inside units 29A and 29B. Twenty three road drainage sites are planned for work including rocking, dip construction and culvert repair/replacement. Howell’s lewisia and slender false lupine were found in unit 29A. More information is available on the THP Tracking Center website.
Tweet
No comments:
Post a Comment